SPECIALIZED SERVICES

Facade Rehabilitation in Mallorca.

We diagnose and repair the defects in your facade to guarantee its safety, comply with current regulations and restore its aesthetic value. At Leostroy, every facade rehabilitation protects both the building and the people around it.

ChatGPT Image 6 ago 2026, 12_42_02

CITY COORDINATES

39°33′ N 2°40′ E

The Leostroy Method: How We Carry Out Facade Rehabilitations in Mallorca

Our workflow is designed to remove uncertainty. From the first inquiry to the final handover, every milestone is documented and supervised under superior technical standards.

01

INITIAL REVIEW

We review the documentation and starting conditions to understand the real scope of the project before work begins.

02

TECHNICAL FEASIBILITY ANALYSIS

We assess the project’s construction and regulatory feasibility to anticipate potential constraints or risks.

03

SCOPE AND PRIORITIES

Together with the client, we define what will be done, in what order and with what level of priority, at every stage.

04

COST ESTIMATION AND ADJUSTMENT

We prepare a realistic, detailed budget, tailored to the project’s quality standards and needs.

05

PROJECT SCHEDULING

We design the execution schedule, organizing the project phases to optimize time and resources.

06

CONTRACTOR SELECTION AND COORDINATION

We select and coordinate specialists in every trade, ensuring a safe and efficient build.

07

TECHNICAL MONITORING OF EXECUTION

We supervise the project continuously to ensure it’s carried out according to plan and on schedule.

08

BUDGET AND QUALITY CONTROL

We monitor the budget and the quality of the work at every stage, avoiding deviations and cost overruns.

09

EXECUTION, FINAL REVIEW AND HANDOVER

We close out the project with a thorough review and final handover, ensuring everything meets what was agreed.

30+

PROJECTS COMPLETED


20+

years of experience

20240411_130857

Why Do Your Facade Rehabilitation in Mallorca with Leostroy?

RIGOROUS TECHNICAL DIAGNOSIS

We identify the origin and real severity of cracks, dampness or spalling before intervening, avoiding unnecessary work.

REGULATORY COMPLIANCE

We help you resolve the deficiencies detected in the ITE/IEE inspection within the deadline set by the town hall.

SAFETY FOR PEOPLE AND PROPERTY

We prioritize defects that could pose a risk of falling debris onto public roads.

TESTIMONIALS

What our clients say

Trust is built on facts. These are the experiences of those who have already trusted us for their Facade Rehabilitation in Mallorca

Google
Francisco Tortosa Jiménez profile picture
Francisco Tortosa Jiménez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifica que la fuente original de la reseña sea Google.
Encargamos a Leostroy Construcciones una reforma parcial de nuestra casa y el resultado ha sido excelente. Desde el primer momento nos dieron un presupuesto claro y detallado, se cumplieron los plazos acordados y durante toda la obra estuvieron en contacto constante, informándonos de cada paso. 100% recomendables.

projects

Facade Rehabilitation Projects in Mallorca

Discover some of our Facade Rehabilitation projects in Mallorca, carried out with the same technical rigor and quality control at every stage

Frequently Asked Questions

Everything you need to know about Leostroy before starting your project

Through the Technical Building Inspection (ITE), now integrated in many communities into the Building Evaluation Report (IEE). It is usually mandatory once a building reaches 45-50 years of age, with periodic reviews every 10 years; the exact threshold depends on each town hall.

The town hall sets a deadline, usually between 3 and 12 months depending on the severity, to carry out the necessary repairs and submit a certificate confirming the deficiencies have been resolved.

The most frequent are cracks, render detachment, dampness from water infiltration, deterioration of balconies and overhanging elements, and rebar corrosion, which can compromise safety if not treated in time.

Yes, for buildings subject to mandatory inspection, regulations require a copy of the technical report to be handed over at the time the property is transferred.

A defect diagnosis by a qualified technician, definition of the scope of work, permit management and coordination of the necessary contractors (masonry, scaffolding, waterproofing), with cost control and monitoring through to final handover.

CONTACT

Request a Quote for Your Facade Rehabilitation in Mallorca