New Construction Execution in Mallorca.

We build homes from the foundations to handover, with a technical team that coordinates every phase of the project. At Leostroy, building your home is a process built on control and trust.

09

CITY COORDINATES

41.38° N 2.17° E

The Leostroy Method: How We Carry Out Full Renovations in Mallorca

Our workflow is designed to remove uncertainty. From the first inquiry to the final handover, every milestone is documented and supervised under strict technical and quality standards.

01

INITIAL REVIEW

We review the documentation and starting condition to understand and assess the real scope of  the project before work begins.

02

TECHNICAL FEASIBILITY ANALYSIS

We assess the project’s construction and technical feasibility to anticipate possible undefined points, deviations, constraints or risks.

03

SCOPE AND PRIORITIES

We agree with the client on what will be done, in what order and with what level of priority, at every stage.

04

COST ESTIMATION AND ADJUSTMENT

We prepare a realistic, detailed budget, tailored to the project’s quality standards and needs.

05

PROJECT SCHEDULING

We design the execution schedule, organizing the project phases to optimize time and resources.

06

CONTRACTOR SELECTION AND COORDINATION

We select and coordinate specialists in every trade, ensuring a safe, agile and efficient build.

07

TECHNICAL MONITORING OF EXECUTION

We supervise the project continuously to ensure it’s carried out according to plan and on schedule.

08

BUDGET AND QUALITY CONTROL

We monitor the budget and the quality of the work at every stage, clearly addressing any deviations and cost overruns.

09

EXECUTION, FINAL REVIEW AND HANDOVER

We close out the project with a thorough review and final handover, ensuring everything meets what was agreed.

20+

years of experience

CarrerMuntanya_3

Why Build Your New Home in Mallorca with Leostroy?

TECHNICAL PRECISION

Direct coordination with architects and quantity surveyors so the project is built exactly as designed.

TOTAL TRANSPARENCY

Intensive monitoring, review and verification. Constant, fluid communication with the Client and the Project's Site Management.

ON-TIME DELIVERY

Rigorous planning of every phase to avoid delays and cost overruns during construction.

TESTIMONIALS

What our clients say

Trust is built on facts. These are the experiences of those who have already trusted us to carry out their full renovation in Mallorca

Google
Francisco Tortosa Jiménez profile picture
Francisco Tortosa Jiménez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifica que la fuente original de la reseña sea Google.
Encargamos a Leostroy Construcciones una reforma parcial de nuestra casa y el resultado ha sido excelente. Desde el primer momento nos dieron un presupuesto claro y detallado, se cumplieron los plazos acordados y durante toda la obra estuvieron en contacto constante, informándonos de cada paso. 100% recomendables.

projects

New Construction Projects in Mallorca

Discover some of our New Construction projects in Mallorca, carried out with the same technical rigor and quality control at every stage

Frequently Asked Questions

New Construction in Mallorca: Everything You Need to Know

You need a major works permit, which is applied for with a complete technical project drawn up by a registered architect (drawings, descriptive report, structural calculations and a material execution budget). Each town hall in Mallorca has its own timelines and fees.

It varies depending on the municipality and the complexity of the project; for straightforward urban plots it usually takes between 3 and 6 months, though more complex projects can take close to a year. A complete file from the start and a project aligned with municipal planning helps avoid delays.

 For a medium-sized single-family home, including foundation, structure, installations and finishes, the total timeline usually falls between 14 and 22 months, though it can vary depending on size, plot and technical complexity.

Beyond the construction cost, you also need to budget for the ICIO (construction tax), the municipal permit fee, architect and quantity surveyor fees, technical inspection (OCT) for the ten-year insurance, and, on undeveloped plots, the water and electricity connections.

We act as technical coordinators for the entire project: cost control, work planning and sequencing, contractor selection, continuous technical monitoring and final review before handover, working hand in hand with architects and quantity surveyors.